Product Realisation Assurance

AS9100-aligned Quality knowledge, planning, readiness and assurance tool for controlling the journey from customer requirement through planning, supply chain, production, verification, release and delivery.

Product realisation in simple terms
The key question: “Can we demonstrate that the customer's requirements were correctly translated into a controlled, verified and released product?”

Product realisation is the connected set of activities that turns requirements into a conforming product or service. In AS9100D the relevant controls are principally within Clause 8 — Operation. It is wider than manufacturing: contract review, configuration, design where applicable, external providers, production, special processes, inspection, test, FAI, nonconformance control, release and delivery all contribute.

1. RequirementsCustomer, statutory, regulatory and internal
2. Plan & DefineRisk, configuration, quality and production planning
3. Source & ProduceSupply chain, manufacture and special processes
4. Verify & ReleaseInspection, test, FAI and authorised release
5. Deliver & LearnDelivery, feedback and improvement

AS9100D relationship

8.1 operational planning and control provides the framework. Aerospace-specific controls include operational risk management (8.1.1), configuration management (8.1.2), product safety (8.1.3) and prevention of counterfeit parts (8.1.4). Requirements are addressed in 8.2, design in 8.3, external providers in 8.4, production in 8.5, release in 8.6 and nonconforming outputs in 8.7.

Quality's role

Quality provides assurance that the realisation system is planned, evidence-based and effective. The aim is not to “inspect quality in” at the end; it is to ensure requirements, risks, controls, competence, resources, verification and records are established throughout the lifecycle.

Vertical product / process-trail audit

A powerful assurance technique is to select a real customer order and product serial number or batch, then trace it from contract and requirements through configuration, purchasing, manufacture, special processes, inspection/test, nonconformances, FAI and final release. This tests whether the system actually produced the authorised product.

Example lifecycle
Customer PO → contract review → configuration baseline → production planning → supplier flow-down → incoming verification → manufacture → special processes → inspection/test → FAI → NCR/concession resolution → final verification → authorised release → CofC/delivery → feedback.
Project Definition
Product Realisation Plan
Build the assurance plan. Use N/A only where the requirement genuinely does not apply.
StageControl / DeliverableAS9100 AlignmentRequired?OwnerDue / GateStatusEvidence / ReferenceNotes / Action
Core assurance principle
A completed activity is only meaningful when there is objective evidence. A high completion percentage must never override an unresolved mandatory, safety, regulatory, configuration or acceptance issue.
Product Realisation Readiness Review
Assess readiness before production, a major build gate or final release. Critical items are highlighted.
0%Applicable items complete
0Critical unresolved
0Open / incomplete
0%Plan complete
0%Audit complete
Gate status: Not assessed.
Vertical Product / Process-Trail Audit
Audit trail: Customer PO / contract → requirements → configuration → planning → supplier controls → incoming product → manufacture → special processes → inspection/test → FAI → NCR/concessions → final release → delivery records.
Live Product Realisation Assurance Map
Status is derived from the plan by lifecycle stage: green = complete, amber = work remains, red = blocked/overdue, grey = no applicable activity.
Overall project indicators
0Plan activities
0Complete
0Blocked / overdue
0%Evidence recorded
0Open actions
Review, Approval & Output
Important use note
This app is an educational, planning and assurance aid. It does not reproduce proprietary AS9100 text and does not by itself demonstrate conformity. Apply the organisation's approved QMS, current contractual/customer requirements, statutory/regulatory obligations and applicable standards. Readiness percentages are indicators only; unresolved mandatory requirements require appropriate disposition and authority.