PCBA Process Control

Create controlled manufacturing plans, material traceability, soldering profiles, operator and equipment records, process verification, cleanliness evidence, inspection, rework and final release documentation aligned with IPC J-STD-001 process-control requirements.

Unsaved record
Product class not selected
Project and Document Control
The application records compliance evidence but does not reproduce IPC’s proprietary acceptance criteria. Inspectors and operators must use authorised copies of the applicable standard, addendum, drawing and customer requirements.
IPC and Customer Requirement Basis
Material and Component Traceability
Record bare boards, components, solder alloys, solder paste, flux, wire, adhesives, staking materials, cleaners, coatings and process consumables.
Material / ComponentPart / TypeSpecificationManufacturerLot / Date CodeCertificateExpiryStorage / MSLIncoming Status
Equipment, Environment and Personnel
Assembly Operation Record
SequenceOperationEquipment / ProgrammeProcess ParametersLot / MaterialActual ResultOperatorInspection
Reflow Soldering Profile
Wave, Selective and Hand Soldering Controls
Soldering Process Verification
Process / AreaRequirementActual ParameterBoard / SampleInspection MethodResultRecord / FileReviewer
Cleaning and Process Residue Control
Conformal Coating, Staking and Encapsulation
Inspection and Test Results
Characteristic / AreaRequirement / ReferenceMethod / EquipmentSample / SerialResultPass / FailReport / RecordInspector
Defect, Rework and Repair Register
Board / SerialLocationDefect / ConditionDispositionRework InstructionOperatorReinspection ResultNCR / Record
Nonconformance and Final Release
Approval