Project and Document ControlIdentify the organisation, customer, order, parts, material and controlled processing documents. OrganisationCustomerProject / ContractPurchase Order Part NamePart NumberDrawing / RevisionQuantity Serial / Batch / LotWork Order / Route CardProcedure NumberProcedure Revision Heat Treatment Record No.Processing DateOperatorInspector / Reviewer Part Description and Critical Features
This app records requirements and evidence; it does not determine a valid heat-treatment cycle. Verify the current controlled specification revision and obtain engineering approval for any cycle not explicitly authorised.Material and Specification BasisSelect the material family and record the exact alloy, product form, condition, governing standard and required final condition. Material FamilySelectCarbon / Low Alloy / Tool SteelStainless / Precipitation-Hardening SteelWrought AluminiumCast AluminiumWrought Nickel / Cobalt AlloyCast Nickel / Cobalt AlloyTitanium AlloyCopper AlloyMagnesium AlloyOther / Customer-defined Alloy / GradeProduct FormStarting Condition / Temper Required Final Condition / TemperPrimary Heat Treatment SpecificationSpecification RevisionPyrometry Specification Supplementary SpecificationCustomer / Drawing RequirementMaterial Certificate No.Material Heat / Cast / Batch Special Requirements, Prohibitions and Notes
Material-Specific Planning Select a material family above to display planning fields. Steel Type / Section SizeNormalise / Anneal RequirementAustenitising RequirementQuench MediumTemper RequirementMinimum Temper TemperatureDecarburisation ControlCarburising / Nitriding / Other Stainless / PH GradeSolution / Austenitising RequirementCooling MethodAge / Precipitation ConditionStabilisation / Stress ReliefSensitisation ControlScale / Oxidation ControlFerrite / Corrosion Test Alloy / Temper RouteSolution Heat TreatmentQuench Delay LimitQuench Medium / TemperatureRefrigeration / Natural AgeArtificial Age / Over-ageEutectic Melting / Oxidation CheckConductivity / Hardness Verification Casting Alloy / ConditionSolution Heat TreatmentQuench Delay / MediumAge / StabilisationDistortion SupportHot Isostatic PressingEutectic Melting CheckMechanical / Metallographic Test Alloy / Product FormSolution / Anneal RequirementAge / Precipitation CycleCooling Rate / MethodVacuum / Atmosphere RequirementPartial Pressure GasSurface Contamination CheckGrain Size / Mechanical Test Casting AlloyHomogenise / Solution CycleAge CycleCooling MethodVacuum / AtmosphereHIP RequirementSurface / Alpha Case CheckTest Coupons / Properties Titanium AlloyAnneal / Solution RequirementAge / Stress ReliefVacuum / Inert AtmosphereDew Point / Purity RequirementCooling Rate / MethodAlpha Case / Contamination CheckHydrogen / Mechanical Test Copper AlloyAnneal / Solution CycleAge / Stress ReliefAtmosphere ControlCooling / QuenchHydrogen Embrittlement ControlHardness / ConductivitySurface Condition Magnesium AlloySolution / Anneal CycleAge CycleProtective AtmosphereQuench / CoolingFire / Contamination ControlsOxidation / Burning CheckHardness / Properties Material SystemEngineering AuthorityApproved Process ReferenceMaterial-specific Requirements
Heat Treatment Cycle StepsEnter each controlled heating, soaking, transfer, quenching, cooling, refrigeration and ageing step in sequence.Add StepStepOperationSet TemperatureToleranceRamp RateSoak Start BasisMinimum TimeMaximum TimeAtmosphere / PressureCooling / Transfer
Cycle Programme / Recipe IDProgramme RevisionLoad Thermocouple RequirementStart of Soak DefinitionCycle Notes / Engineering Restrictions
Furnace and Pyrometry ControlRecord equipment class, instrumentation type, calibration, SAT and TUS status required by the applicable AMS2750 revision. Furnace / Oven / Bath IDEquipment TypeAir furnaceControlled atmosphere furnaceVacuum furnaceSalt bathFluidised bedInduction equipmentRefrigeration equipmentQuench systemOtherFurnace ClassInstrumentation Type Qualified Operating RangeWork ZoneControl Instrument IDRecording Instrument ID Calibration Certificate / DateCalibration DueLast SAT / DueLast TUS / Due Sensor Type / LotSensor Use / Reuse StatusCorrection Factors / OffsetsAlarm / Over-temperature Check Atmosphere / Vacuum CapabilityLeak Rate / Vacuum TestGas Type / PurityDew Point / Oxygen Level
Calibration currentSAT current and acceptableTUS current and acceptableQualified work zone observedSensors within permitted useChart / electronic data verified
Load and Part TraceabilityRecord each part lot, quantity, location, rack, witness coupon and load thermocouple.Add Load ItemItem / LotPart NumberMaterial / HeatQuantityRack / PositionSection SizeLoad TC ID / LocationCoupon / Test Piece
Rack / Fixture IDFixture Material / ConditionLoading Diagram ReferenceMaximum / Minimum LoadRacking, Separation, Masking and Distortion Controls
Part cleanliness acceptedMaterial and lot traceability verifiedParts correctly racked and supportedHeating and quench access maintainedLoad thermocouples correctly attachedForeign material / contamination excluded
Quench, Cooling and Transfer Record Quench / Cooling MediumTank / System IDMedium Specification / ProductBatch / Analysis Reference Initial TemperatureFinal TemperatureConcentration / ViscosityAgitation / Flow Transfer Start TimeImmersion / Cooling StartActual Transfer DelayPermitted Transfer Delay Cooling DurationExit / Removal TemperatureRefrigeration Start / TemperatureDelay to Age / Temper Quench Observations, Foaming, Vapour Blanket, Distortion or Interrupted Quench
Inspection and Test ResultsRecord hardness, conductivity, tensile, impact, microstructure, case depth, decarburisation, grain size, surface contamination and other required verification.Add TestTest / CharacteristicRequirementMethod / StandardSample / LocationResultUnitPass / FailReport No.Inspector
Temperature / Cycle EvidenceAdd EvidenceStageActual Temperature RangeSoak StartSoak EndActual TimeChart / Data FileConformance
Visual Surface ConditionDistortion / Dimensional ResultReheat / Retreatment StatusTest Summary and Technical Evaluation
Nonconformance and Final ReleaseNCR / Deviation / Concession No.DispositionCertificate of Conformity No.Final StatusAcceptedAccepted under concessionRetreat / ReworkRejectedPendingDeviation, Alarm, Interruption or Nonconformance Details
ApprovalProcessed ByDateReviewed ByDateApproved ByDateCustomer / Independent ApprovalDateRelease Notes