FAIR Review & Approval

A guided review tool for checking a supplier or internal First Article Inspection Report before approval. Designed to help new reviewers work systematically through scope, configuration, Forms 1–3, supporting evidence, sub-assemblies, nonconformances and final disposition.

Guided tick-box review AS9102C-aware Contract requirements still apply
0%
Review completed
0
Checks passed
0
Issues / failures
Draft
Disposition

How to Review a FAIR

Start here if you are new to FAIR review
Your job as reviewer: establish that the FAIR is for the correct product and configuration, that the required scope has been covered, and that objective evidence supports conformity to each applicable design requirement. Do not approve a FAIR merely because all three forms are present.
1. ScopeWhy was FAI required?
2. ConfigurationCorrect part & revision?
3. Forms 1–2Accountability complete?
4. Form 3Every characteristic?
5. EvidenceTraceable & valid?
6. DispositionApprove or return?

Before you start

Identify the purchase order/contract, drawing or model revision, applicable specifications, customer requirements and the FAIR baseline. Confirm whether the review is Full or Delta/Partial and why.

Traceability mindset

Requirement → FAIR entry → result → evidence. You should be able to follow that chain without guessing. References on the forms should point clearly to certificates, inspection reports or other records.

Do not rely on “Pass” alone

For measurable characteristics, check the recorded result and its acceptance against the stated tolerance. For attribute requirements, confirm that the evidence is appropriate and traceable.

Form 1

Check part identity, FAIR identifier, configuration, FAI type, reason/scope and assembly accountability. For a Delta/Partial FAIR, confirm the baseline FAIR and affected change are clearly defined.

Form 2

Check material, special processes and functional tests against the design requirement. Verify specification/revision, source or processor approval where required, certificate/report reference and traceability to the FAI article.

Form 3

Reconcile the ballooned drawing/model with Form 3. Check dimensions, GD&T, notes, surface finish, marking, process requirements and other design characteristics. Look for skipped or duplicated balloons.

Good review evidence: current configuration, complete characteristic accountability, actual results where appropriate, clear certificate/report references, approved sources where required, and consistent part/lot/serial traceability.
Common reasons to return a FAIR: wrong revision, missing characteristics, incomplete Delta scope, missing or mismatched certificates, unresolved nonconformance, untraceable CMM results, incorrect specification revision, or contradictory information between forms.

Reviewer decision rule

Use the checklist to record what you actually verified. A failed mandatory check should normally prevent approval until resolved. “N/A” should mean genuinely not applicable—not “not checked”. The app is a review aid and does not replace the current 9102 standard, contractual flow-down, customer portal instructions or delegated approval requirements.

FAIR & Review Details

Define the review basis first

Guided Review Checklist

Select Pass, Fail, N/A or Review for each check. Fail and Review items are carried into the approval report.

0 of 0 checks completed

Sub-assemblies / Detail Parts / Referenced FAIRs

For assemblies, record the parts or sub-assemblies whose FAIR status is relevant to the top-level FAIR.

Part numberDescriptionRevisionFAIR referenceStatusNotesAction

Concessions, Deviations & Nonconformances

Record any concession/deviation/NCR associated with the FAI. A product disposition does not by itself demonstrate that the FAIR is complete; verify the applicable FAI requirements and correction/re-accomplishment needs.

TypeReferenceAffected characteristic / requirementStatusReviewer assessmentAction

Supporting Evidence Register

Evidence typeReferenceRevision / dateTraceabilityReview resultCommentsAction

Approval & Disposition

Decision pending
Complete the checklist before making the final disposition.

FAIR Review & Approval Report

Complete the review and select Generate Approval Report.