AS9102 First Article Inspection Report

Use this interactive form to compile an AS9102-style First Article Inspection Report (FAIR). Capture Part Number Accountability, Product Accountability and Characteristic Accountability, then export as PDF, Excel or save/load your work as JSON.

Fields marked with * are strongly recommended. JSON save/load keeps your draft data and dynamic rows so you can continue later.
FAIR form 1
Form 1
Part Number Accountability
Describe the part and the FAIR context.
FAIR / FAI report number *
Part number *
Part name *
Part revision level *
Drawing / model number
Customer name *
Customer part number
Purchase order / contract
Serial / lot / batch
Organisation name *
Supplier / site code
Manufacturing process / operation
Manufacturing location
FAI type *
Date of FAI
FAI performed by
FAIR form 2
Form 2
Product Accountability – Materials, Special Processes & Tests
List materials, special processes and functional tests used for the FAI part.
ItemType (material, process, test) / description, spec, cert and result.
FAIR form 3
Form 3
Characteristic Accountability, Verification & Compatibility
Record each ballooned characteristic, its requirement and measured result.
Characteristic rowsEnter each characteristic from the ballooned drawing. Keep text concise – detailed CMM reports can be attached separately.
FAIR approval
Approval
FAIR Approval & Disposition
Record final disposition and approvals.
Overall FAIR disposition *
Disposition notes *
Quality approval
Customer / delegated approval