AS9102 First Article Inspection Report Builder

Plan, compile, review and export a structured First Article Inspection Report. The app guides users through FAIR planning, Part Number Accountability, Product Accountability, Characteristic Accountability, approval and a professional report suitable for printing or saving as PDF.

Forms 1–3 workflow Autosave & JSON Verify customer requirements
0%
FAIR completeness
0
Materials, processes and tests
0
Characteristics recorded
Draft
Overall disposition

What a FAIR Demonstrates

Production process verification
A First Article Inspection provides objective evidence that the planned production processes, documentation, tooling, materials, special processes, inspection methods and acceptance activities have produced an item conforming to the applicable design requirements. It is not simply an inspection of one finished part.
PlanDefine scope and triggers
Form 1Part accountability
Form 2Materials, processes, tests
Form 3Characteristics and results
ApproveReview and disposition

Full FAIR

Normally used for a new part or when the full production process must be demonstrated. All applicable design characteristics and accountability records are included.

Partial FAIR

Normally addresses only affected characteristics or activities following an authorised change. Clearly identify the baseline FAIR and the reason for the partial scope.

FAIR package

Common supporting evidence includes a ballooned drawing, material certificates, special-process certificates, inspection reports, test reports, approved deviations and traceability records.

Good FAIR Practice

Do: use the actual production route, production tooling, approved sources, current configuration and representative inspection methods.
Do not: treat the app as a replacement for the current AS9102 forms, customer portal, contractual requirements or independent technical review.

FAIR Planning & Readiness

Planning incomplete
0% complete

Form 1 — Part Number Accountability

Form 2 — Product Accountability

Record raw materials, special processes, functional tests and associated certificates or reports. Use one row for each accountable item.

#TypeDescription / operationSpecification / requirementSupplier / processor / labCertificate / reportResultCommentsAction

Form 3 — Characteristic Accountability

Enter every applicable ballooned design characteristic. Results should be traceable to the inspection record and measurement method.

BalloonZoneRequirementTolerance / limitsActual resultInspection method / equipmentDesignatorResultReference / notesAction

Review, Approval & Disposition

Electronic working record

FAIR Report Preview

Complete the FAIR and select Generate Professional Report.